ENGINEERING

  • 1. SOP preparation
    • 1.1 Preventive maintenance
    • 1.2 Calibration
    • 1.3 Equipment operation
    • 1.4 Water system
    • 1.5 HVAC
    • 1.6 Utility
  • 2. Risk assessments
    • 2.1 Reactive Risk assessments
    • 2.2 Proactive Risk assessments
  • 3 Study protocol
    • 3.1 Study protocol on power outage.
    • 3.2 Study protocol on filter cleaning.
    • 3.3 Study protocol on water consumption, air consumption and steam consumption etc.
  • 4 Audit preparation
  • 5 Training
    • 5.1 GDP
    • 5.2 GMP
    • 5.3 GEP

QUALIFICATION/VALIDATION

  • 1. URS/DQ/IQ/OQ/PQ documents for Black utility.
  • 2. URS/DQ/IQ/OQ/PQ documents for HVAC.
  • 3. URS/DQ/IQ/OQ/PQ documents for Water system.
Close Menu